A lot of plumbing was done inside the house and the driveway was dug
up to install what I believe are water returns from the gutters in between
our unit and the one attached. We also have neighbors behind us now as
you can see their cars in various pics.
An important day! My friend Jesse came up from Colorado Springs to
help me pre-wire the house for speakers. The whole house is now wired
for a centrally controlled stereo system. We also happened to catch the
pouring of our driveway and sidewalk! While tempted, I did not engrave
my name into the driveway...maybe I should have?
The driveway has been covered up to dry. More electrical work was done
and I noticed the stop sign on the corner (along with the port-a-potty)
that points out just where unit #67 is! Still waiting for the back door
(on order...). The unit was cleaned up as well, which is nice as we expect
this means work will begin on the inside soon....
The driveway is uncovered. I went back in after talking to Dan, the
head contractor, and pre-wired cat5 for an internal computer network.
Once the house is done and I do a little more work, you will be able to
hook into our DSL connection from virtually anywhere in the house! You
get to see the bathtubs in this set for the first time (although they
were installed a while back). The last couple of pics are looking through
the wall to the other units that we are attached to.